Bridge to the Castle Hill

Map: Bridge to the Castle Hill
The new bridge leads to the Castle Hill from the south. It replaced the old truss footbridge which was located in the exact same place. The new bridge was built in 2014, using prefabricated elements KUJAN NG (new generation) supported on reinforced-concrete abutments. It allows heavy trucks such as ambulances or firetrucks to enter the Castle Hill.

TYPE: road bridge
CROSSES: Żeglina river
STRUCTURE: reinforced concrete
   Design: beam bridge
   Main girders: KUJAN NG prefabricated elements
GEOMETRY:
   Number of spans: 1 (18,00 m)
   Total span length: 18,50 m

View of the bridge

Closer look to details

Superstructure and railings

Underside of the bridge