The bridge structure consists of 14 prefabricated beams type GROMNIK. The bridge was built in the 1980s. In 2015 the asphalt pavement was renovated during the reconstruction of Dolna street.
TYPE: road bridge
CROSSES: Myja river
STRUCTURE: concrete
Design: beam bridge
Main girders: GROMNIK prefabricated elements
GEOMETRY:
Number of spans: 1 (11,55 m)
Total span length: 12,10 mAsphalt pavement on the bridge |
Beams supported on the abutment |
Overall view of the bridge |