The new bridge was built in 2008 replacing the old one. The structure is equipped with barriers and can withstand the load of class A according to Polish Norm PN-85/S-10030. The bridge is a soil steel composite bridge made with corrugated steel plate and local soil as backfill.
TYPE: road bridge
CROSSES: Niniwka river
STRUCTURE: steel
Design:integrated bridge
Main girders: corrugated steel plate
GEOMETRY:
Number of spans: 1 (4,50 m)
Total span length: 11,00 mView from the eastern side |
Steel barriers on the bridge |